Key takeaways
- You can hire a manager before the house is rent-ready; the walk-through is more useful before the money is spent.
- Smoke alarms and security devices are the legal floor: Property Code 92.255 and 92.153 put them on the landlord.
- Rekeying is the one item worth waiting on: the 92.156(a) deadline is seven days after the new tenant moves in.
- Paint, floors and upgrades should follow a rent range from leased comparables, not your taste.
- Every make-ready line is billed under the plan you sign; ask for it in writing first.
No. Your house does not need to be rent-ready before you hire a manager, and in most cases it should not be. Do the items Texas law requires now, because they are fixed rules, and leave the cosmetic and upgrade decisions until a manager has walked the house and you know what it should rent for. Owners in Fort Worth, Keller and North Richland Hills who finish first often spend on the wrong rooms.
This guide sorts the usual list into "do it now" and "wait." The timing of the hire itself is in when to hire a property manager before the house is rent-ready, and the full repair triage is in what repairs to make before listing.
Fix now or wait: the rent-ready list for a Texas house
Here is what to do before you call a manager, what to leave for the manager's walk-through, and why:
| Item | Do it now or wait | Why |
|---|---|---|
| Smoke alarms: at least one in each bedroom, one in the hallway serving bedrooms, one on each level | Check now; replace dead or missing units | Property Code 92.255(a) sets the locations, and 92.258(b) requires a working test at the beginning of the tenant's possession |
| Window latches, door viewers, keyless bolting devices, sliding door pin locks and bars | Check now; buy what is missing | Required by 92.153(a) at the landlord's expense (92.153(c)), whether or not the tenant asks |
| Dead bolt height and throw | Measure now | 92.154: 36 to 48 inches from the floor for devices installed since September 1, 1993, and a throw of at least one inch |
| Rekeying the exterior locks | Wait, and schedule it for move-in week | 92.156(a) sets the deadline at the seventh day after the tenant turnover date, the day the new tenant moves in; every contractor, agent and showing key issued before then is a reason to rekey last |
| Active leaks, no hot water, electrical hazards, a dead A/C or furnace | Fix now | Conditions like these come back as repair requests under 92.052(a) the moment a tenant is in the house |
| Deep clean, yard, trash haul-off | Now if the house is empty; otherwise with the make-ready | Cheap, and they make every later step (photos, quotes, showings) easier |
| Paint color, flooring, counters, fixtures | Wait for the walk-through and a rental analysis | This is where owners spend on taste instead of rent; leased comparables tell you what the house competes with |
| Appliance replacement and larger upgrades | Wait, get the rent range first | The upgrade has to be paid back by rent or lower turnover cost, which you cannot judge without the number |
How to read this table: the top rows are legal floor items with fixed rules, so doing them now is never wasted. The bottom rows are judgment calls, and they are the ones a walk-through and a rent range change most. The rekey row is the exception that rewards waiting: the deadline in 92.156(a) runs from the day the new tenant moves in, and a rekey done after the last contractor leaves covers everyone who held a key. This is general information, not legal advice.
What rent-ready means under Texas law, and what it does not
"Rent-ready" mixes three standards, and only the first one is law.
- The legal floor. Under Property Code 92.153(a), a dwelling must have a window latch on each exterior window, a doorknob lock or keyed dead bolt on each exterior door, a sliding door pin lock and a handle latch or security bar on each sliding glass door, and a keyless bolting device and door viewer on each exterior door. Section 92.153(c) puts the cost on the landlord, and 92.153(d) says the rule applies when a tenant is in possession. Section 92.255(a) requires a smoke alarm in each separate bedroom, one in the corridor serving several bedrooms, and one on each level.
- The repair standard. Section 92.052(a) obliges a landlord to make a diligent effort to repair a condition that materially affects the physical health or safety of an ordinary tenant, or a failure to provide hot water of at least 120 degrees, once the tenant gives notice and is current on rent. A house that starts with those conditions starts with repair requests.
- The market standard. Paint, flooring, fixtures and appliances that match what nearby rentals offer. No statute covers it; leased comparables do.
The detail on devices and alarms is in Texas security device and smoke alarm rules. This is general information, not legal advice.
Why the walk-through should come before the spending
The manager is the person who has to lease the house at the price you want, so the manager's walk-through is the best moment to decide what to spend. A walk-through answers three questions an owner working alone usually guesses at: which items are legal floor, which ones a renter will notice at a showing, and which ones will not move the rent at all.
The second input is the rent range. A rental analysis built from homes that actually leased nearby tells you what your house competes with. If comparable rentals have older kitchens and the rent still holds, a new kitchen is a gift to the tenant. If they all have hard-surface floors and yours has worn carpet, the floor may be the one upgrade that matters. Without the range, every upgrade is a guess.
Illustrative only, not a quote: an owner with $6,000 to spend could put it all into cabinets because they look oldest, or split it between flooring, paint and the missing security devices. Which split pays depends on the comparables, which is the point of waiting a week.
How hiring and make-ready overlap
Hiring and make-ready do not have to run one after the other. A sensible order is: call, get the rental analysis, sign, have the house walked, approve a written list, let the work run, and photograph the finished rooms. While the trades work, the listing text, the screening criteria and the lease can be prepared, so the house is not finished and then idle while paperwork starts.
Two dates matter more than the rest. The first is the day the house is market-ready, because that is when marketing can honestly start. The second is the move-in date, because the rekey under 92.156(a) and the smoke alarm test under 92.258(b) are tied to the tenant taking possession. Book both into the make-ready list so they are not forgotten.
The room-by-room detail of what a first make-ready includes is in can a property manager arrange cleaning, painting and yard work, and what tends to pay is in the make-ready guide.
What owners pay for that tenants do not
The expensive mistakes are rarely bad work. They are good work on the wrong things.
- A full kitchen remodel in a house whose comparables rent with original kitchens.
- Premium flooring that will not survive pets, furniture and move-outs.
- Several custom paint colors, each of which has to be matched at every turnover.
- Landscaping that needs weekly care the lease will put on the tenant.
- Furniture or extra appliances left behind as a favor, which become items you maintain.
A fair test for any upgrade: would a renter pay more for it, stay longer because of it, or cause less wear on it? If the answer is no on all three, skip it until the rent range says otherwise. The same test, applied to repairs rather than upgrades, is in must fix, should fix, can wait.
If you already finished the house
Nothing is wasted. A manager taking on a finished house still checks the legal floor, because the list in 92.153 and 92.255 has to be true on the day a tenant moves in, not on the day the painter left. Expect a short list: missing door viewers or sliding door bars, a smoke alarm missing from one bedroom, a dead bolt mounted outside the 36 to 48 inch band in 92.154, and the move-in rekey.
The other conversation is about price. If the house is finished above what nearby rentals offer, the rent may not reflect the full spend, and the honest advice is to price it to lease rather than to recover the remodel. If it is below the market standard, you will hear which inexpensive items close the gap.

How Perpetual helps with a house that is not ready yet
Perpetual Property Management is broker-owned, with Justin Brown as Broker/Owner, and our office is at 5755 Rufe Snow Dr in North Richland Hills. For a house that is not ready yet, our site states:
- Before you spend: our free rental analysis includes a rent range from leased comps and make-ready guidance on "which improvements raise rent, and which just cost money," plus a written management quote, typically within one business day.
- Inspection at the start: a property enrollment inspection, $49 on Standard, $125 on Investor Special, included with onboarding on Full Service, and a 360-degree condition inspection at every move-in.
- Billing the work: maintenance coordination is 4.9% of cost on Standard and 5% on Full Service, and make-ready coordination is 3% to 5% of cost on the Investor Special (portfolios of 5 or more units); the original invoice is always in your portal (price sheet).
- Your own contractor: usually yes, if they are insured and reliable (maintenance coordination).
- Listing: live on every major rental platform within 5 business days of being market-ready, or the first month's management fee is waived, subject to the Guarantee Addendum.
How the make-ready list is scoped and approved for your house is confirmed in writing in the management agreement, and if a fee is not in the agreement, you do not pay it. If your house is not ready, call 682-593-7033 before you buy the paint.

The takeaway: Fix the legal floor now, wait for the walk-through and a rent range on everything cosmetic, and schedule the rekey for move-in week.
Questions owners ask
Will a property manager coordinate repairs on an empty house before it is listed?
A full-service manager typically coordinates the make-ready through vendors and bills the cost to you, often with a coordination charge. Ask how it is billed and what you must approve. At Perpetual, maintenance coordination is 4.9% of cost on Standard and 5% on Full Service, make-ready coordination is 3% to 5% on the Investor Special, and the original invoice is always in your portal. Your own insured, reliable contractor is usually fine too.
Can a property manager start marketing before the make-ready work is finished?
It can, as long as the photos show finished rooms and the listing states an honest availability date. Perpetual's written marketing guarantee starts the clock when the house is market-ready: live on every major rental platform within 5 business days, or the first month's management fee is waived, subject to the Guarantee Addendum. A house still full of tools is not market-ready.
What has to be fixed before a tenant can legally move into a Texas rental?
The Property Code sets a floor: the security devices in 92.153(a) (window latches, door locks or dead bolts, sliding door pins and bars, keyless bolting devices and door viewers) at the landlord's expense, smoke alarms in the locations in 92.255(a) tested at the start of possession (92.258(b)), and a rekey within seven days after the tenant turnover date (92.156(a)). Conditions that materially affect health or safety trigger the 92.052 repair duty once a tenant gives notice. This is general information, not legal advice.
Should I rent the house as-is and let the tenant do the cosmetic work?
Rarely a good trade. You lose control over what is changed, the work may be done badly or not at all, and the house still has to meet the legal floor on the day the tenant moves in. A plain, durable finish and a price set from leased comparables usually serve better than a discount for tenant labor.
Should I rekey the locks before I hire a manager?
Usually not. Property Code 92.156(a) requires the rekey not later than the seventh day after each tenant turnover date, and 92.151(15) defines that date as the day a tenant moves in after all previous occupants have moved out. Rekeying early is not forbidden, but contractors, agents and showings will all use keys before then, so a rekey in move-in week is the one that protects the new tenant. Keep the receipt.
Do I need a rental analysis before I start repairs?
It helps. The rent range from leased comparables tells you which upgrades the market pays for. Perpetual's rental analysis is free, includes make-ready guidance on which improvements raise rent and which just cost money, and comes with a written management quote, typically within one business day, whether or not you hire us.